veraiuska Posted December 15, 2015 Posted December 15, 2015 Good evening. I have a question on how to face the following case study:We want to increase the number of turbines in an existing wind farm. We have a met mast measuring right behind (~600m, being ~100m rotor diameter length) an existing wind turbines line (down and up wind aligned related to met mast). When building this WaSP project, I am considering that this wind measuring campaign is already registering the existing wake effect from the windfarm in front... My question is, how should I "draw" the existing windfarm in WaSP project? As roughness elements or as windturbines?I usually use free wind field campaigns (non existing wind farms but only future ones). But this time I suppose I should build this project in A different way.Thank you very much for your help,VERA
Mark Kelly Posted January 22, 2016 Posted January 22, 2016 Hi Vera, you should enter the windfarm as turbines. Cheers,--Dr. Mark Kelly, DTU Wind Energyon behalf of WAsP
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now